Commissioning for compressor stations

Commissioning for Compressor Station

Start with Preparation when you install compressor Stationary.

quality-oriented process of achieving, evaluating, and documenting building performance, to meet defined objectives.

One job that is considered to involve almost all sectors is the construction manufacturing industry. Where this is very related to the course of our lives, whether primary, secondary or tertiary.
Much of the project work industry will involve the use of methodologies that are considered more systematic and disciplined in achieving a more accurate expectation of success.
Compressors are one of the most important components that are a necessity in every job, whether small, medium or large category jobs.

Compressors have an important role in mining work where operators or engineers have the task of determining the design and installation of air distribution. The methodology of creating stations for compressors is the most ideal strategy that is able to integrate and operate in the gas transmission system.

Application of the method commissioning in heavy equipment work both construction and mining is the most important part of a compressor station project. This can include acceptance tests, cleaning activities, pre-commissioning, punch listing commissioning, core commissioning activities and operation.
So, we need to know that in the process of making a compactor station, it must be done in a safe and efficient way within the specified time frame and budget.

The successful operation of a compressor station largely depends on the quality of the three stages of commissioning, including the following:

  • a. Pre-commissioning, is the overall process at the end of the construction and installation phase, preparing the compressor station for transfer to the core (main) commissioning phase.
    b. Core or The core trial stage is when the various station systems are placed into initial operation.
    c. Startup, the startup process occurs when the compressor station is brought into actual operation.

So at this commissioning stage, the compressor will be very important in the compressor station project work. In many cases, the compressor cannot be operated properly due to problems in the commissioning process.